Project Scope
The work on this project consisted of removal of existing steam heating systems and equipment, and conversion of existing steam heating systems to hot water. Additional upgrades included the installation of a new Viessmann oil fired boiler and distribution systems, heating pumps and hydronic accessories, classroom unit ventilators, heating terminals, ventilation air systems, fuel oil day tank and distribution systems, metal chimney liner, upgrades to existing gymnasium and cafeteria heating and venting units, DDC controls system, solar heating system and accessories. The renovation work also included the tie in of with existing biomass heating plant system currently under construction. Work also included suspended acoustical ceiling repair/replacement, floor finish repair, painting, and associated patching and repair.
Project Team
ABM’s Role: General Contractor
Owner: Madawaska School Department
Subcontractors: Damon Insulation, IB Automated Controls, Central City Sheetmetal, County Electric, NicCait Construction, Yankee Balancing, Kevin W. Smith & Son Roofing
Special Project Considerations
Due to the large extent of the work on this project being mechanical in nature, ABM Mechanical served as the general contractor. This required ABM to be responsible for the maintaining the overall project schedule. Because the work consisted of renovations to a school, the project timeframe was limited to the length of summer vacation. Despite the tight project timeframe ABM finished the project in time for the school to resume in September.